Loop Check · AI FTE reality check

Find the hours your best people should get back.

Map one role, task by task, to the right mix of human and AI. In about ten minutes you get a loop-mode map, the capacity your team can redeploy, and a one-page report to share with your leadership.

Human out of the loopAI runs it. People audit samples.
Human effort ≈ 10%
Human on the loopAI acts. People handle exceptions.
Human effort ≈ 30%
Human in the loopAI drafts. People approve each output.
Human effort ≈ 60%
Human-ledPeople lead. AI assists the work.
Human effort ≈ 90%
Step 1 of 3

The role

Pick one role with several people doing similar work. That is where the signal is strongest.

Step 2 of 3

The tasks

List the 3 to 6 tasks that fill most of the week, with the share of time each one takes. Aim for a total close to 100%.

Step 3 of 3

Rate each task

Five quick ratings per task, from 1 to 5. A higher score means the task is a better fit for AI.

Almost there

Where should we send your report?

Your results appear straight away, and the one-page report is ready to download.

Loop Check
Edward Galle · Loop Check
Your Loop Check

FTE capacity to redeploy
Share of the role AI can carry
Annual value of that capacity
TaskTimeFitLoop modeWhat to do next

Method: each task is scored on five axes (repetition, data readiness, error tolerance, rules vs judgement, accountability). The average sets the loop mode; a low score on error tolerance or accountability keeps a person in the loop. Human effort remaining per mode is a planning assumption (out of the loop 10%, on the loop 30%, in the loop 60%, human-led 90%) and 1,720 working hours per FTE, refined with measured data in the diagnostic. edwardgalle.com · A brand from Kainjoo SA, Rue du Sablon 2, 1110 Morges